E-Construct

The digital construction platform built for UK contractors

Live Project Overview

One platform.
Every process.

E-Construct

Bridgewater Phase 2

Dashboard
Workforce
Attendance
Inductions
Daily Logs & Records
Allocation Sheets
Daily Briefings
Project Design Control
Drawing Register
TQ / RFI Register
Engineering
Quality
Survey
Health & Safety
Compliance Analytics
COSHH
Project Assistant
Compound Planner
Traffic Management
Financial
Dashboard
Early Warnings
Reports
Plant Dashboard
Plant
Project Settings
Accounts Management
● Dashboard
Monday, 30 June 2026
EMERGENCY

Dashboard — Bridgewater Phase 2

14
Workers on Site
3
Expired Competencies
7
Expiring in 30 Days
2
RAMS Expiring (14d)
RAMS Review Required
C1496-MS-001 · Earthworks Rev 2Overdue
C1496-MS-003 · Concrete Pours Rev 1Due in 5d
Competency Alerts
J. Mitchell · CPCS A59Expired
D. Brennan · CSCS LabourerExpired
R. Okonkwo · First Aid7 days
Currently On Site14
T. Harrison
S. Patel
M. O'Brien
C. Williams
A. Kowalski
+9 more on site
Health & Safety Management

Safety, compliance & audits.
All in one workspace.

From toolbox talks to incident investigations — manage your entire H&S programme digitally, with full audit trails.

E-Construct

Bridgewater Phase 2

Dashboard
Workforce
Attendance
Inductions
Daily Logs & Records
Allocation Sheets
Daily Briefings
Project Design Control
Drawing Register
TQ / RFI Register
Engineering
Quality
Survey
Health & Safety
Compliance Analytics
COSHH
HAVS
Inspections & Audits
Observations
Permits
Project Assistant
Compound Planner
Traffic Management
Financial
Dashboard
Early Warnings
Reports
Plant Dashboard
Plant
Project Settings
Accounts Management
● Health & Safety3 Open Actions

H&S Workspace

2
Near Misses (30d)
1
Incidents YTD
6
Open Observations
4
Audits This Month
Open Inspection Actions
INS-024Excavation edge protection missing — Grid F4
High02 Jul
INS-023PPE signage faded — Tower crane access
Medium05 Jul
INS-021Fire extinguisher inspection overdue — Site office
Low10 Jul
Toolbox Talks (June)
Working at Height12 att · 27 Jun
Manual Handling9 att · 20 Jun
COSHH Awareness14 att · 13 Jun
Latest Incident
INC-2026-04 · Near Miss
Operative slipped on wet walkway near compound entrance. No injury. 18 Jun 2026
Investigation: Closed
Permits & HAVS Tracking

Digital permits to work.
Live HAVS exposure tracking.

Issue and sign off permits digitally, and monitor hand-arm vibration exposure against HSE thresholds in real time.

E-Construct

Bridgewater Phase 2

Dashboard
Workforce
Attendance
Inductions
Daily Logs & Records
Allocation Sheets
Daily Briefings
Project Design Control
Drawing Register
TQ / RFI Register
Engineering
Quality
Survey
Health & Safety
Compliance Analytics
COSHH
HAVS
Inspections & Audits
Observations
Permits
Project Assistant
Compound Planner
Traffic Management
Financial
Dashboard
Early Warnings
Reports
Plant Dashboard
Plant
Project Settings
Accounts Management
● Permits & HAVS2 permits open

Permit to Work Register

PTW-0142Hot WorksCompound Zone B
Open
PTW-0139Confined SpaceManhole MH-07
Open
PTW-0135ExcavationGrid F4 — Trench 3
Closed

HAVS Exposure Monitoring

J. Mitchell

62% of daily EAV

S. Patel

38% of daily EAV

D. Brennan

91% of daily EAV

Design & Drawing Control

Your live drawing register.
Every revision tracked.

Upload, manage, and issue drawings with full revision history — linked to your TQ/RFI register and site teams.

E-Construct

Bridgewater Phase 2

Dashboard
Workforce
Attendance
Inductions
Daily Logs & Records
Allocation Sheets
Daily Briefings
Project Design Control
Drawing Register
TQ / RFI Register
Engineering
Quality
Survey
Health & Safety
Compliance Analytics
COSHH
Project Assistant
Compound Planner
Traffic Management
Financial
Dashboard
Early Warnings
Reports
Plant Dashboard
Plant
Project Settings
Accounts Management
● Drawing Register32 drawings · Last updated today

Drawing Register — Bridgewater Phase 2

AllCivilStructuralDrainageM&E
Drawing RefTitleRevStatusDisc.Date
BWP2-CIV-001Site Layout — Overall ArrangementP4
Approved for Construction
Civil14 Jun 26
BWP2-CIV-014Earthworks Cut & Fill Sections — A-AP3
Approved for Construction
Civil09 Jun 26
BWP2-STR-002Foundation Pile Cap Detail — Type AP2
In Review
Structural21 Jun 26
BWP2-STR-009RC Frame Elevation — Grid Lines 1-5P1
Issued for Comment
Structural25 Jun 26
BWP2-DRN-003Drainage Layout — Phase 2 NorthP3
Approved for Construction
Drainage02 Jun 26
BWP2-DRN-007Manhole Schedule & DetailsP2
Superseded
Drainage18 May 26
BWP2-ELE-001Temporary Power Distribution LayoutP1
In Review
M&E28 Jun 26
BWP2-RD-002Access Road — Formation & SurfacingP5
Approved for Construction
Roads07 Jun 26
Quality Management

Paperless quality control.
Built for the site.

Custom digital forms, ITPs, concrete testing, drainage records — all linked to your project and fully auditable.

E-Construct

Bridgewater Phase 2

Dashboard
Workforce
Attendance
Inductions
Daily Logs & Records
Allocation Sheets
Daily Briefings
Project Design Control
Drawing Register
TQ / RFI Register
Engineering
Quality
Survey
Work Packs
Health & Safety
Compliance Analytics
COSHH
Project Assistant
Compound Planner
Traffic Management
Financial
Dashboard
Early Warnings
Reports
Plant Dashboard
Plant
Project Settings
Accounts Management
● Quality✓ 58 submissions this month

Quality Forms & ITPs

AllConcreteInspectionsDrainageAudits
🏗️

Pre-Pour Concrete Check

Concrete · 8 submissions

Today
last entry
📐

ITP — RC Foundation Works

Inspections · 14 submissions

Yesterday
last entry
🔩

Structural Steel Sign-Off

Inspections · 5 submissions

27 Jun
last entry
💧

Drainage Pressure Test Record

Drainage · 3 submissions

25 Jun
last entry
🧪

Concrete Cube Test Register

Concrete · 22 submissions

Today
last entry
📋

SHEQ Site Inspection

Audits · 6 submissions

28 Jun
last entry
ITP Progress — RC Foundation Works68% complete
✓ 17 passed⏳ 4 pending4 not started

Ready to digitise your
construction sites?

Join UK contractors already using E-Construct to run safer, smarter digital construction sites.